CONSTRUCTION OF AN INDUSTRIAL CHPP ON THE BIOMASS LUZGA SUNFLOWER AT THE MEP

Kirovograd, Ukraine

 

COMPOSITION OF THE PROJECT

  • Development of design and engineering documentation;

  • Execution of the construction part;

  • Delivery of 3 boilers;

  • Building installation;

  • Installation of 3 boilers E-16-3.9-360 D of total steam production. 48 t;

  • Installation of HVO systems of ash removal and gas cleaning;

  • Installation of an electrostatic precipitator;

  • Installation of a 2.5 MW backpressure turbine;

  • Commissioning and commissioning;

All work was carried out on its own, with the exception of the construction part (subcontractor).

PROJECT DETAILS

  • Customer : Kirovogradoliya LLC

  • Date : 2007-2009

  • Completed works : General contract

"LLC KIROVOGRADOLIYA" OIL FAT FACTORY